Geauga Lake Today

                                                     Park Maps . Rides & Attractions . Links . Parkitechure . Park Views . Park History

Your Ad Here


· Forums · FAQ · Search · Members · Groups · Register · Profile · Private Messages · Log in

Author Message
amradiostars
Beaver Land Mine Ride
User is Offline
Beaver Land Mine Ride


Joined: 23 Sep 2007
Posts: 25


Posted: Sun Aug 23, 2009 7:52 am    Post subject: Info on new coaster for Kennywood
· Quote

Kennywood Media Release
Release: Immediate
Media Contact: Jeff Filicko
412-461-0500 x1176
JFilicko@Kennywood.com

Kennywood Amusement Park Announces
Launch Roller Coaster as New Ride for 2010!

West Mifflin, PA – Kennywood is proud to announce the addition of a seventh roller coaster for the 2010
season! Joining the ranks of the Lil’ Phantom, Exterminator, Jack Rabbit, Racer, Thunderbolt, and Phantom’s
Revenge, the new Linear Synchronous Motor (LSM) launch roller coaster is unlike any other roller coaster at
Kennywood.

“This roller coaster will provide a thrilling new experience for coaster lovers at Kennywood,” explains General
Manager Jerome Gibas. “The use of LSM launch technology will allow riders to blast from 0 to 50mph in three
seconds and offers our first roller coaster with inversions since the Steel Phantom.”

Kennywood’s new launch coaster will feature many exciting and unique features including three
inversions and a 0-50mph launch in three seconds! After the high-speed launch, riders will experience
a vertical ascent to 95ft before a brief cliffhanger pause at the top and a 90-degree drop into a
maximum G-force pullout. The riders then enjoy extended airtime as the train races into an inverted
top hat element, passes into a barrel roll and goes vertical again through a twist up leading to another
pause.

Riders experience a second vertical free fall followed by another maximum G-force pullout on the way
into a highly banked fan curve. After a traditional corkscrew, a curve to a zero gravity hill, and a series
of wave turns, riders finally return to the station.
The new roller coaster will be placed in the current location of the Turnpike, a ride that has been at
Kennywood since 1966. Guests will only have to say ‘see you later’ to the Turnpike since plans are
already underway to bring back the ride in the near future. The Turnpike’s final day of operation will
be Aug. 16, 2009.

Kennywood’s new launch coaster is proudly built in the U.S.A. by Premier Rides of Millersville,
Maryland.

The project is expected to be complete in May of 2010. Official coaster name and logo information
will be released in the coming weeks. See www.kennywood.com for a preview video and updates.

Ride Statistics:
Track Length: 2100 feet
Maximum Speed: 50 mph
Ride Time: 65 seconds
Number of Trains: 2
Number of Cars Per Train: 2
Number of Riders Per Train: 12
# # #
_________________
As my avatar says "Geauga Lake killed by a real DICK
Back to top

dsloban
Thunderhawk
User is Offline
Thunderhawk


Joined: 19 Jul 2007
Posts: 1073


Posted: Sun Aug 23, 2009 10:36 am    Post subject:
· Quote

Sounds like it will be a blast! I can't wait to see it!
_________________
Life is like a rollercoaster. It is full of ups and downs!
Back to top

CuddyTheFlash
Double Loop
User is Offline
Double Loop


Joined: 14 Sep 2008
Posts: 244
Location: In the darkest corner of your mind

Posted: Sun Aug 23, 2009 12:13 pm    Post subject:
· Quote

Capacity is gonna suck.  Get ready for LONG lines.
_________________
I don't like a certain company so everything they do MUST be wrong, even if it's right.  And that makes me look like a bigger fool.
Take a stand against coasters that hurt or kill people.  Holiday World & Knotts Berry Farm, we are watching you!
Back to top

John Peck
Double Loop
User is Offline
Double Loop


Joined: 03 Jul 2007
Posts: 279
Location: Columbus, Ohio USA

Posted: Sun Aug 23, 2009 1:14 pm    Post subject:
· Quote

You know, the ride time is so short that the train will most likely be back before the ride is completely loaded, and there's the fact they only have to load/check 12 people so lines should fly for this thing.

It may not look great capacity-wise on paper, but if they have their operations up to par with someone to measure kids at the entrance and a test seat, it will make for quick throughput.

It seemed like a constant occurrence when Six Flags and Paramount would have to hold the train up to measure a kid in the station, not to mention the angry parent who waited an hour for it.
Back to top

   
All times are GMT - 4 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum

Click here to return to Geauga Lake Today Homepage

Geauga Lake Today and Forever (GLT) Forums are not affiliated with Geauga Lake's Wildwater Kingdom or Cedar Fair L.P.  If you are looking for whats left of the official Geauga Lake website, click here.

Your Ad Here
Powered by phpBB © 2001, 2005 phpBB Group

Looking for free phpbb3 hosting?